Saturday, November 17, 2007

More Day 166, Nov 16th Pickwick Dam and Lock





The first photo is leaving the Pickwick Dam and Lock - note the tow and barge waiting for the next lock through. This lock is one of the higher ones that we've traversed with a fifty-five foot lift. We locked through with several other Looper boats with the wind blowing really strong. This makes for a challenging locking experience in both tying up and exiting the lock.

No comments: