The first photo is leaving the Pickwick Dam and Lock - note the tow and barge waiting for the next lock through. This lock is one of the higher ones that we've traversed with a fifty-five foot lift. We locked through with several other Looper boats with the wind blowing really strong. This makes for a challenging locking experience in both tying up and exiting the lock.
Saturday, November 17, 2007
More Day 166, Nov 16th Pickwick Dam and Lock
The first photo is leaving the Pickwick Dam and Lock - note the tow and barge waiting for the next lock through. This lock is one of the higher ones that we've traversed with a fifty-five foot lift. We locked through with several other Looper boats with the wind blowing really strong. This makes for a challenging locking experience in both tying up and exiting the lock.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment